Finneytown Redevelopment – Preparing the Site for a New Chick-fil-A (Cincinnati, Ohio)

General Contractor: Dalo Construction

In the heart of Finneytown, a new Chick-fil-A location is taking shape—but before construction can begin, the site must first be safely and carefully transformed. Our team was selected to complete the full demolition and site preparation of an 11,135-square-foot former strip retail center, clearing the way for the new restaurant while maintaining strict safety and environmental standards.

Safety First—For Everyone

Safety is the foundation of every decision on this project. Our demolition plan was developed to protect both on-site personnel and the surrounding community. With nearby traffic and public access areas, we implemented controlled demolition practices, clearly defined work zones, and coordinated operations to ensure every phase of the project is executed responsibly and securely.

Protecting the Surrounding Community

Working along a busy roadway requires careful planning beyond the jobsite fence. Our approach focuses on minimizing the impact on neighboring businesses, pedestrians, and motorists. Dust suppression systems are deployed throughout demolition and truck loading operations to reduce
airborne particles and maintain clean air conditions in the surrounding area.

Controlling Dust and Debris

Demolition can generate significant dust and material movement if not properly managed. Our crews use continuous water application and controlled material handling to limit debris migration beyond the site. This proactive approach keeps the environment cleaner while improving visibility and safety for workers and nearby traffic.

A Clean and Controlled Loading Zone

Material removal is managed through a designated loading zone engineered for efficiency and cleanliness. By maintaining a clean staging area and carefully managing truck movement, we prevent mud and debris from being tracked onto the adjacent public roadway—helping keep surrounding
streets safe and clean for the community.

Building the Foundation for What’s Next

Once demolition is complete, the site must be properly prepared for new construction. Our team coordinates closely with geotechnical professionals to test and verify backfill lifts, ensuring the ground conditions meet structural requirements for the new building. Every phase of our work—from demolition to site preparation—is designed to keep the project on schedule while maintaining the highest standards of safety, cleanliness, and environmental responsibility. With careful planning and disciplined execution, we are helping lay the groundwork for Finneytown’s newest Chick-fil-A location.

Services Provided

Contact us (513-617-1401) for more information or a quote

ABS Services logo

About ABS Services

ABS Services provides comprehensive commercial construction services to Greater Cincinnati, Northern Kentucky, and Southeast Indiana. We have the experience, equipment, and the right team to get the job done!
Learn More